Calculating developer time during development process
AssigneeInternational Business Machines Corporation
InventorsRosalind Toy Allen Radcliffe, Hannah Justine Neumann, Arthi Ireddy
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsRosalind Toy Allen Radcliffe, Hannah Justine Neumann, Arthi Ireddy
Estimating the term…
Aspects of the invention include computer-implemented methods, computing systems and computer program products for calculating an active time on a software application with respect to a first work item. A computer-implemented method includes retrieving activity data from a software development application and a plurality of input signals generated by a peripheral device. The method further includes determining a causal relationship between the input data and any events described by the activity data. In response to a determination of a causal relationship, a first time interval is calculated between an initial signal and a final signal of the plurality of input signals. The first time interval is compared to an estimated time interval. A schedule of a second work item is determined based on the comparison, wherein the first time interval relates to a first work item.
A computer-implemented method comprising:
A system comprising:
A computer program product comprising a computer readable storage medium having program instructions embodied therewith, the program instructions executable by a processor to cause the processor to perform operations comprising:
Dependencies are inferred from the claim text.