Engineering completion and selective fracturing of lateral wellbores
AssigneeSchlumberger Technology Corporation
InventorsModhar Khan, Robert Utter, Irlan Amir, Dmitriy Potapenko, Joseph Gremillion
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchlumberger Technology Corporation
InventorsModhar Khan, Robert Utter, Irlan Amir, Dmitriy Potapenko, Joseph Gremillion
Estimating the term…
A method for completing a wellbore traversing a subterranean formation includes making electromagnetic resistivity measurements along a lateral section of the wellbore. The resistivity measurements are evaluated to estimate a water content of the subterranean formation along the lateral section. The formation is fractured at selected regions along the lateral section at which the water content is below a threshold and avoiding regions at which the water content is above the threshold.
A method for completing a wellbore traversing a subterranean formation, the method comprising:
A method for completing a wellbore traversing a subterranean formation, the method comprising:
Dependencies are inferred from the claim text.