Method for pretensioning a tower of a wind power plant
AssigneeWobben Properties GmbH
InventorRoy KERSTEN
Life of this patent
Estimating the term…
Loading patent…
AssigneeWobben Properties GmbH
InventorRoy KERSTEN
Estimating the term…
A method for pretensioning a tower of a wind power installation, comprising the steps: providing a tensioning device having an adapter element and/or a foundation arrangement and a tensioning element, and/or an adapter element and/or a foundation arrangement, fastening a lower end of a tensioning element a fastening means of the adapter element, fastening an upper end of a tensioning element to an upper end of the tower, tensioning the tensioning element at the lower end of the tensioning element and/or at the upper end of the tensioning element, wherein the tensioning of the tensioning element is effected by reduction of a clearance between the foundation and the adapter element.
A method for pretensioning a tower of a wind power installation, the method comprising:
Dependencies are inferred from the claim text.