Automated creation of modular industrial plants
AssigneeABB Schweiz AG
InventorsMario Hoernicke, Katharina Stark, Dirk Schulz, Raoul Jetley
Life of this patent
Estimating the term…
Loading patent…
AssigneeABB Schweiz AG
InventorsMario Hoernicke, Katharina Stark, Dirk Schulz, Raoul Jetley
Estimating the term…
A computer-implemented method for generating a construction plan for a modular plant that is to execute a given industrial process includes: providing a flow chart of the industrial process, the flow chart including a sequence of actions, each action having at least one input for an educt to be processed by the action and at least one output for a product produced by the action, at least one product of one action being an educt for another action; providing at least one catalogue of module descriptions, each module description characterizing at least the educt inputs and the product outputs of at least one physical process module, and physical actions performed within the physical process module; and decomposing the flow chart into functional units with at least one educt input, at least one product output, and one or more actions leading from the one or more educts.
A computer-implemented method for generating a construction plan for a modular plant that is to execute a given industrial process, comprising:
A computer-implemented method for verifying a feasibility of a given temporal execution sequence of actions in a given industrial plant, the industrial plant comprising a plurality of physical process modules, each physical process module having at least one educt input, at least one product output, and being able to perform at least one action to convert the at least one educt into the at least one product, the method comprising:
Dependencies are inferred from the claim text.