Method and apparatus for predicting hard drive failure
AssigneeDell Products L.P.
InventorsPatrick Mcguinness, Nagendra-Vikas Kamath, Elmira M. Bonab, WeiTa Chen, Joe Ray
Life of this patent
Estimating the term…
Abstract
A method is provided, comprising: retrieving telemetry data from a first storage device; generating a failure risk score for the first storage device, the failure risk score being generated by using a failure inference engine, the failure inference engine being arranged to execute a predictive failure model for calculating the failure risk score; and outputting the failure risk score for use in servicing the first storage device.
Claims20
A method comprising:
- retrieving telemetry data from a first storage device;
- generating a failure risk score for the first storage device, the failure risk score being generated by using a failure inference engine, the failure inference engine being arranged to execute a predictive failure model for calculating the failure risk score;
- and
- outputting the failure risk score for use in servicing the first storage device.
A system comprising:
- a storage device;
- and
- at least one processor operatively coupled to the storage device, the at least one processor being configured to perform the operations of:
- retrieving telemetry data from a storage device;
- generating a failure risk score for the storage device, the failure risk score being generated by using a failure inference engine, the failure inference engine being arranged to execute a predictive failure model for calculating the failure risk score;
- and
- outputting the failure risk score for use in servicing the storage device.
A non-transitory, computer-readable medium storing one or more processor-executable instructions, which when executed by at least one processor further cause the at least one processor to perform the operations of:
- retrieving telemetry data from a first storage device;
- generating a failure risk score for the first storage device, the failure risk score being generated by using a failure inference engine, the failure inference engine being arranged to execute a predictive failure model for calculating the failure risk score;
- and
- outputting the failure risk score for use in servicing the first storage device.
Dependencies are inferred from the claim text.