Method for detecting a short circuit across a load
AssigneeRobert Bosch GmbH
InventorsFederico Ignacio Sanchez Pinzon, Johannes Zondler, Yannick Chauvet
Life of this patent
Estimating the term…
Loading patent…
AssigneeRobert Bosch GmbH
InventorsFederico Ignacio Sanchez Pinzon, Johannes Zondler, Yannick Chauvet
Estimating the term…
A method includes determining a first voltage that is in a high-side path of a circuit, the path including a high-side switch connected between a first potential connection of the circuit and a first connection of a load of the circuit; determining a second voltage that is in a low-side path of the circuit, the path including a low-side switch connected between a second potential connection of the circuit and a second connection of the load; responsive to a determination that one of the voltages exceeds a threshold for at least a duration of a predefined time interval, checking whether the other voltage currently exceeds the threshold; and determining that there is a short circuit across the load or in whichever of the paths has the voltage that exceeded the threshold for the duration, respectively, if the result of the check is positive or negative.
1-10. (canceled)
A method for a circuit that includes a load, a high-side path in which a high-side switch is connected between a first potential connection and a first connection of the load, and a low-side path in which a low-side switch is connected between a second potential connection and a second connection of the load, the method comprising:
A device comprising a processor, wherein the processor is programmed to:
A non-transitory computer-readable medium on which are stored instructions that are executable by a processor and that, when executed by the processor, cause the processor to perform a method for a circuit that includes a load, a high-side path in which a high-side switch is connected between a first potential connection and a first connection of the load, and a low-side path in which a low-side switch is connected between a second potential connection and a second connection of the load, wherein the instructions include:
Dependencies are inferred from the claim text.