Real-time diversion control for stimulation treatments using tortuosity and step-down analysis
AssigneeHalliburton Energy Services, Inc.
InventorsSrinath Madasu, Geoffrey W. Gullickson
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsSrinath Madasu, Geoffrey W. Gullickson
Estimating the term…
System and methods of controlling diversion for stimulation treatments in real time are provided. Input parameters are determined for a stimulation treatment being performed along a wellbore within a subsurface formation. The input parameters include selected treatment design parameters and formation parameters. A step-down analysis is performed to identify friction components of a total fracture entry friction affecting near-wellbore pressure loss during the stimulation treatment. Efficiency parameters are determined for a diversion phase of the stimulation treatment to be performed along a portion of the wellbore, based on the input parameters and the friction components. An amount of diverter to be injected during the diversion phase of the stimulation treatment is calculated based at least partly on the efficiency parameters. The diversion phase of the stimulation treatment is performed by injecting the calculated amount of diverter into the subsurface formation via perforations along the portion of the wellbore.
A method of controlling diversion for stimulation treatments in real time, the method comprising:
A system comprising:
A computer-readable storage medium having instructions stored therein, which when executed by a computer cause the computer to perform a plurality of functions, including functions to:
Dependencies are inferred from the claim text.