Managing top-off charging and discharge testing of battery packs to optimize capacity
AssigneeInternational Business Machines Corporation
InventorsNoah SINGER, Steven John AHLADAS, Robert K. MULLADY
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsNoah SINGER, Steven John AHLADAS, Robert K. MULLADY
Estimating the term…
Computer-implemented managing of battery capacity within a battery system is provided. The managing includes obtaining, by one or more processors, data representative of a number (N) of battery packs in the battery system, and ascertaining, by the processor(s), a battery pack self-discharge time interval (TD) from full-charge to a partially discharged threshold for initiating top-off charging. The managing also includes determining, by the processor(s), a charge-staggering time interval (TS) using the number (N) of battery packs in the battery system and the ascertained battery pack self-discharge time interval (TD), and staggering, by the processor(s), top-off charging of the battery packs of the N battery packs in the battery system using, at least in part, the charge-staggering time interval (TS).
A computer-implemented method of managing battery capacity within a battery system, the computer-implemented method comprising:
A system for managing battery capacity within a battery system, the system comprising:
A computer program product for managing battery capacity within a battery system, the computer program product comprising:
Dependencies are inferred from the claim text.