Splitting a time-range query into multiple sub-queries for serial execution
AssigneeVMware, Inc.
InventorsSundeep TIYYAGURA, Mirza Mohsin BEG, A. Christer SABELSTROM
Life of this patent
Estimating the term…
Loading patent…
AssigneeVMware, Inc.
InventorsSundeep TIYYAGURA, Mirza Mohsin BEG, A. Christer SABELSTROM
Estimating the term…
Techniques for splitting a time-range query into sub-queries for serial execution are provided. In one embodiment, a user query is received requesting items within a time range from a database. The time range is divided into a plurality of time periods within the time range. Sub-queries defining respective time periods of the plurality of time periods are generated from the user query, and a first sub-query is executed. The first sub-query defines a first time period of the plurality of time periods, where the first time period is a most-recent time period or a least-recent time period among the plurality of time periods. If it is determined that a number of items obtained from executing the first sub-query is greater than or equal to a predetermined result target, then the items obtained from executing the first sub-query are provided and subsequent sub-queries are not executed.
A method for splitting a time-range query into sub-queries, the method comprising:
A distributed-computing system for splitting a time-range query into sub-queries, comprising:
A non-transitory computer-readable storage medium storing one or more programs configured to be executed by one or more processors, the one or more programs including instructions for:
Dependencies are inferred from the claim text.