Split crane for installation of wind turbines and other tall structures
AssigneeHeerema Marine Contractors Nederland B.V.
InventorJan VAN EGMOND
Life of this patent
Estimating the term…
Loading patent…
AssigneeHeerema Marine Contractors Nederland B.V.
InventorJan VAN EGMOND
Estimating the term…
The present invention relates to a method for installing a wind turbine or other tall structure at a target location at sea, the method comprising: providing an installation vessel comprising at least one crane, wherein the crane comprises a lower boom part, a right boom part, and a left boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, lifting a tall structure part, in particular the nacelle assembly, with the crane, wherein in top view the tall structure part is supported at least partially between the right and left boom part by one or more hoist lines extending from the right and left boom part to the tall structure part.
Method for installing a wind turbine or other tall structure at a target location at sea, the method comprising:
Method according to preceding claim, wherein the tall structure part is a nacelle assembly comprising a nacelle, a hub, and a mast or part thereof extending downward from the nacelle, with or without one or more blades or parts thereof connected to the hub, the blades extending over a vertical distance upwardly or downwardly from the nacelle, wherein when seen in top view the nacelle, the mast or part thereof is held between the right and left boom part.
Method according to any of the preceding claims, wherein a lifting frame is connected to the tall structure part at a position below the right and left boom part, and wherein one or more hoist lines extend from the right and left boom part to the lifting frame, and wherein the tall structure part extends upwards from the lifting frame to a location between the right and left boom part or above the right and left boom part.
Method according to the preceding claim, wherein the tall structure part is a nacelle assembly comprising the nacelle and the mast or a part of the mast of the wind turbine, the mast or part thereof extending downward from the nacelle, and wherein the lifting frame is connected to the mast or part thereof below the nacelle.
Method according to any of the two preceding claims, wherein a stabilizing device is provided between the right and/or left boom part and the stabilized part of the tall structure part which is located above the lifting frame, wherein the one or more hoist lines carry the weight of the tall structure part, in particular the nacelle assembly, and wherein the stabilizing device holds the tall structure part upright.
Method according to the preceding claim, wherein the stabilizing device comprises:
Method according to the preceding claim, wherein the clamp comprises a through opening which extends vertically, and wherein a part of the tall structure part extends through the through opening, and wherein in particular the clamp comprises:
Method according to any of the two preceding claims, wherein the nacelle of the nacelle assembly is supported at a horizontal level of the right and left boom part or above the right and left boom part.
Method according to any of the preceding claims, wherein the tall structure part is a nacelle assembly comprising a nacelle, a hub and blades, and wherein when seen in top view the hub and the blades protrude over a horizontal distance forward of the right and left boom part and stay clear of the right and left boom part.
Method according to any of the preceding claims, wherein the nacelle assembly is transferred from a support position on board the installation vessel to the foundation, to the mast, or to a lower part of the mast at the target location.
Method according to any of the preceding claims, wherein the crane comprises at least a right hoisting system for hoisting the portion of the load suspended from the right boom part and a left hoisting system for hoisting the portion of the load suspended from the left boom part and wherein the right and left hoisting system cooperate in the lifting operation.
Method according to any of the preceding claims, wherein the crane initially comprises a single upper boom part, wherein the single upper boom part is removed and replaced by the right and left boom part prior to the lifting operation.
Method according to any of the preceding claims, wherein the left and right boom part are connected to the base of the crane via a hinge, either directly or indirectly via another crane part, in particular the lower boom part, which is connected to the base of the crane by said hinge, allowing the left and right boom part to pivot upward and downward.
Method according to the preceding claim, wherein the left and right boom part extend upwards and/or outwards from the point where they are mounted to the crane.
Method according to any of the preceding claims, wherein the crane comprises a junction at an upper end of the lower boom part wherein the right and left boom part extend from the junction.
Method according to the preceding claim, wherein the junction is located at 50 to 95 percent of a total height of the crane, preferably at 70 to 95 percent of the total height of the crane.
Method to any of the preceding claims where the two hoists are used in combination with more hoists, more specifically three hoists, two hoists in front and one aft of the nacelle assembly or four hoists, two in front and two aft of the nacelle assembly, or more hoists if required.
Method according to any of the preceding claims, wherein in side view the tall structure part extends partly above and partly below a left boom part free end and a right boom part free end of the respective left and right boom parts, and at least partly between boom part free ends and the junction.
Method according to any of the preceding claims, wherein the left boom part and the right boom part are identical and mirrored with respect to each other.
Installation vessel configured for lifting a tall structure part, in particular a nacelle assembly, of a tall structure, in particular a wind turbine, which is to be installed at a target location at sea, the installation vessel comprising at least one crane, wherein an upper part of the crane comprises two boom parts, a right boom part and a left boom part, wherein the crane further comprises a lower boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, and wherein the space is configured for accommodating the tall structure part, in particular a nacelle assembly of a wind turbine.
Installation vessel according to the preceding claim, comprising a lifting frame configured to be connected to a lower portion of the tall structure part.
Installation vessel according to the preceding claim, wherein the lifting frame has a right side and a left side, wherein a hoist line extend from the right boom part to the right side and wherein a hoist line extends from the left boom part to the left side of the frame.
Installation vessel according to the preceding claim, wherein the clamp comprises a through opening which extends vertically, and wherein a part of the tall structure part extends through the through opening, and wherein in particular the clamp comprises:
Installation vessel according to the preceding claim, wherein the left and right boom part extend upwards and outwards from the point where they are mounted to the crane.
Installation vessel according to the preceding claim, wherein cables extend from a part of the crane to the left and right boom part.
Installation vessel according to the preceding claim, wherein the right and left hoisting system are independently operable.
Installation vessel according to the preceding claim, wherein the right and left hoisting system comprise a load balancing device for balancing the load between the right and left hoisting system.
Installation vessel according to the preceding claim, wherein an open space is provided between the right and left free ends of the respective right and left boom parts.
Installation vessel according to the preceding claim, wherein an angle of divergence (α) between the left boom part and the right boom part during lifting is between 10 and 100 degrees, preferably between 45 and 100 degrees.
Combination according to the preceding claim, wherein when seen in side view the nacelle of the nacelle assembly is supported at the horizontal level of the right and left boom part or above the right and left boom part.
Crane configured for lifting a tall structure part, in particular a nacelle assembly, of a tall structure, in particular a wind turbine, which is to be installed at a target location at sea, wherein an upper part of the crane comprises two boom parts, a right boom part and a left boom part, wherein the crane further comprises a lower boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, and wherein the space is configured for accommodating the tall structure part, in particular a nacelle assembly of a wind turbine.
Crane according to the preceding claim, comprising a lifting frame configured to be connected to a lower portion of the tall structure part.
Crane according to the preceding claim, wherein the left and right boom part extend upwards and/or outwards from the point where they are mounted to the crane.
Crane vessel according to the preceding claim, wherein cables extend from a part of the crane to the left and right boom part.
Crane according to the preceding claim, wherein an angle of divergence between the left boom part and the right boom part during lifting is between 10 and 100 degrees, preferably between 45 and 100 degrees.
Crane according to the preceding claim, wherein an open space is provided between the right and left free ends of the respective right and left boom parts.
Dependencies are inferred from the claim text.