Integrated schedule management apparatus and integrated schedule management method
AssigneeHitachi, Ltd.
InventorHideya YOSHIUCHI
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi, Ltd.
InventorHideya YOSHIUCHI
Estimating the term…
It is made possible to adjust schedules of objects to be managed including hardware boxes and individuals including involved parties. An integrated schedule management apparatus includes: a communication section that receives schedules of a user or/and a hardware box and associated schedules associated with the user or/and the hardware box from one or a plurality of management servers via a network; and an integrated schedule management section that generates an integrated schedule obtained by integrating the schedules received from the one or the plurality of management servers for each of the user or/and the hardware box, and an integrated associated schedule obtained by integrating the associated schedules received from the one or the plurality of management servers for each of the user or/and the hardware box, and that reflects the generated integrated schedule and the generated integrated associated schedule in the one or the plurality of management servers.
An integrated schedule management apparatus comprising:
An integrated schedule management method carried out by an integrated schedule management system having one or a plurality of management servers and an integrated schedule management apparatus connected via a network, the integrated schedule management method comprising:
Dependencies are inferred from the claim text.