Schedule creation device, schedule creation method, and program
AssigneeMitsubishi Heavy Industries, Ltd.
InventorTatsuki TAKAZAKI
Life of this patent
Estimating the term…
Abstract
Provided is a schedule creation device for creating a conveyance schedule according to which a conveyance device conveys a product to work positions designated for each manufacturing process. Said schedule creation device sets a first score to the work positions and to a conveyance path of the conveyance device; sets a second score for products; and uses the first score and the second score to determine the product to be conveyed by the conveyance device from among products present at a plurality of work positions.
Claims11
A schedule creation device that creates a transport schedule of a transport device on which a product is transported to a work position determined for each production process by the transport device, the schedule creation device comprising:
- a schedule creation unit that sets a first score to the work position and a transport path of the transport device, sets a second score to the product, and decides the product to be transported by the transport device from among the products present at a plurality of the work positions based on the first score and the second score.
A schedule creation method,
- wherein a schedule creation device that creates a transport schedule of a transport device on which a product is transported to a work position determined for each production process by the transport device
- sets a first score to the work position and a transport path of the transport device, sets a second score to the product, and decides the product to be transported by the transport device from among the products at a plurality of the work positions based on the first score and the second score.
A program causing a computer of a schedule creation device to function as:
- in creating a transport schedule of a transport device on which a product is transported to a work position determined for each production process by the transport device,
- means for setting a first score to the work position and a transport path of the transport device;
- means for setting a second score to the product;
- and
- means for deciding the product to be transported by the transport device from among the products present at a plurality of the work positions based on the first score and the second score.
Dependencies are inferred from the claim text.