System and method for managing devices during reboot
AssigneeDell Products L.P.
InventorsSantosh Gore, Rajib Saha, Raveendra Madala, Krishnaprasad Koladi
Life of this patent
Estimating the term…
Abstract
An asset includes a physical computing resource. The physical computing resource is directly used by a virtual entity. The asset also includes a resource manager. The resource manager disconnects the virtual entity from the physical computing resource during a low resource consumption reboot of the asset until the low resource consumption reboot of the asset is complete. The resource manager also directly connects the virtual entity to the physical computing resource after the low resource consumption reboot of the asset.
Claims20
An asset, comprising:
- a physical computing resource directly used by a virtual entity;
- and
- a resource manager programmed to:
- disconnect the virtual entity from the physical computing resource during a low resource consumption reboot of the asset until the low resource consumption reboot of the asset is complete;
- and
- directly connect the virtual entity to the physical computing resource after the low resource consumption reboot of the asset.
A method for managing an asset comprising a physical computing resource directly used by a virtual entity of the asset, comprising:
- disconnecting the virtual entity from the physical computing resource during a low resource consumption reboot of the asset until the low resource consumption reboot of the asset is complete;
- and
- directly connecting the virtual entity to the physical computing resource after the low resource consumption reboot of the asset.
A non-transitory computer readable medium comprising computer readable program code, which when executed by a computer processor enables the computer processor to perform a method for managing an asset comprising a physical computing resource directly used by a virtual entity of the asset, the method comprising:
- disconnecting the virtual entity from the physical computing resource during a low resource consumption reboot of the asset until the low resource consumption reboot of the asset is complete;
- and
- directly connecting the virtual entity to the physical computing resource after the low resource consumption reboot of the asset.
Dependencies are inferred from the claim text.