A method for erecting a tower of an offshore wind turbine, the tower having a central axis and including a first tubular, a second tubular movably disposed about the first tubular, and a third tubular movably disposed about the second tubular, wherein the first tubular, the second tubular, and the third tubular are nested and concentrically arranged, the method comprising:
- (a) raising the first tubular axially relative to the second tubular and the third tubular with an elevator disposed about the tower;
- (b) axially extending the first tubular from the second tubular and the third tubular during (a);
- (c) locking the axial position of the first tubular relative to the second tubular after (b);
- (d) lowering the elevator relative to the first tubular, the second tubular, and the third tubular after (c) with the first tubular axially locked relative to the second tubular;
- (e) raising the second tubular and the first tubular with the elevator after (d) with the first tubular axially locked relative to the second tubular;
- (f) axially extending the second tubular from the third tubular during (e);
- (g) locking the axial position of the first tubular and the second tubular relative to the third tubular after (f);
- and
- (h) lowering the elevator relative to the first tubular, the second tubular, and the third tubular after (g) with the first tubular and the second tubular axially locked relative to the third tubular.