Method and apparatus for handling beam failure recovery regarding cell deactivation in a wireless communication system
AssigneeASUSTeK COMPUTER INC.
InventorsYi-Hsuan Kung, Yu-Hsuan Guo
Life of this patent
Estimating the term…
Abstract
A method and apparatus are disclosed. In an example from the perspective of a User Equipment (UE), the UE triggers a first beam failure recovery (BFR) associated with a first cell. In response to the first triggered BFR, the UE triggers a Scheduling Request (SR) for Secondary Cell (SCell) beam failure recovery. In response to deactivation of the first cell, the UE cancels the first triggered BFR and the triggered SR for SCell beam failure recovery associated with the first cell.
Claims20
A method of a User Equipment (UE), comprising:
- triggering a first beam failure recovery (BFR) associated with a first cell;
- responsive to the first triggered BFR, triggering a Scheduling Request (SR) for Secondary Cell (SCell) beam failure recovery;
- and
- responsive to deactivation of the first cell, canceling the first triggered BFR and the triggered SR for SCell beam failure recovery associated with the first cell.
A User Equipment (UE), comprising:
- a control circuit;
- a processor installed in the control circuit;
- and
- a memory installed in the control circuit and operatively coupled to the processor, wherein the processor is configured to execute a program code stored in the memory to perform operations, the operations comprising:
- triggering a first beam failure recovery (BFR) associated with a first cell;
- responsive to the first triggered BFR, triggering a Scheduling Request (SR) for Secondary Cell (SCell) beam failure recovery;
- and
- responsive to deactivation of the first cell, canceling the first triggered BFR and the triggered SR for SCell beam failure recovery associated with the first cell.
A non-transitory computer-readable medium comprising processor-executable instructions that when executed by a User Equipment (UE) cause performance of operations, the operations comprising:
- triggering a first beam failure recovery (BFR) associated with a first cell;
- responsive to the first triggered BFR, triggering a Scheduling Request (SR) for Secondary Cell (SCell) beam failure recovery;
- and
- responsive to deactivation of the first cell, canceling the first triggered BFR and one of:
- stopping SR transmission for SCell beam failure recovery if the UE does not have an activated cell associated with a second triggered BFR;
- or
- not stopping the SR transmission for SCell beam failure recovery if the UE has an activated cell associated with the second triggered BFR.
Dependencies are inferred from the claim text.