Mining System
AssigneeTechnological Resources Pty. Limited
InventorsAndrew Hill, Thomas Albrecht, Konstantin M. Seiler, Andrew W. Palmer, Steven J. Scheding, Glenn Callow
Life of this patent
Estimating the term…
Abstract
A mining system for directing mine operations including a flow planner and a dispatcher. The flow planner receives operating parameters and global mine data and calculates a flow plan based on the operating parameters and the global parameters. The dispatcher then determines dispatch assignments based on the flow plan from the flow planner, and effects a dispatch of mining equipment based on the dispatch assignments.
Claims65
A mining system for directing mine operations, the system including:
- a flow planner that receives operating parameters and global mine data and calculates a flow plan based on the operating parameters and the global parameters, wherein the flow plan is for a flow planning window of time, wherein the flow plan includes at least one planned flow rate for the flow planning window, and the at least one planned flow rate varies with time within the flow planning window;
- and
- a dispatcher that determines dispatch assignments based on the flow plan from the flow planner, and effects a dispatch of mining equipment based on the dispatch assignments.
A mining system for directing mine operations, the system including:
- a planner providing operating parameters;
- a data input providing global mine data;
- a flow planner that:
- receives the operating parameters from the planner and receives the global mine data from the data input, and
- determines at least one planned flow rate by optimising a first objective function defined by at least one of each of the operating parameters and the global mine data, wherein the first objective function includes a cost function, wherein the flow planner determines the at least one planned flow rate for a flow planning window of time, and wherein the at least one planned flow rate varies with time over the flow planning window;
- and
- a dispatcher that determines dispatch assignments based on the at least one planned flow rate from the flow planner, and effects a dispatch of equipment based on the dispatch assignments.
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
A mining system for directing operation of mining equipment within a mine operation, the system including:
- a parameter module providing operating parameters;
- a data input module providing global mine data and updated global mine data, wherein the updated global mine data includes a stream of sensor data;
- a flow planner module that is in communication with the parameter module and the data input module to receive the operating parameters and the global mine data, and the flow planner module determining at least one planned flow rate for a flow planning window of time based on the operating parameters and the global mine data, wherein the at least one planned flow rate varies with time within the flow planning window, wherein the flow planner module determines at least one updated planned flow rate based on the updated global mine data;
- and
- a dispatcher module that autonomously directs operation of the mining equipment based on the at least one updated planned flow rate received from the flow planner module.
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
Dependencies are inferred from the claim text.