System and method of scheduling work within a workflow with defined process goals
AssigneeVerint Americas Inc.
InventorsEdward Hamilton, Kaushik Deka
Life of this patent
Estimating the term…
Abstract
A system and method schedule work within a workflow with defined process goals. A plurality of work queues are defined that comprise work items. The plurality of work queues are associated with one or more links between a parent work queue and at least one child work queue to form at least one work process. At least one work process goal is defined for each work process. A work schedule to achieve the work process goals is generated.
Claims21
-20. (canceled)
A method of optimizing a workflow for scheduling work assignments, the method comprising:
- defining a plurality of work queues, each work queue representative of a task to be completed;
- displaying the plurality of defined work queues in a graphical user interface;
- receiving, through the graphical user interface, a selection of at least two work queues of the plurality of defined work queues;
- presenting a graphical indication of each of the selected work queues on the graphical user interface;
- creating, in the graphical user interface, at least one directional graphical link between two of the at least two selected work queues, binding two of the at least two selected work queues;
- creating at least one work process in the workflow by receiving, in the graphical user interface, a selection of at least two of the selected work queues;
- graphically depicting each of the work processes with a unique color;
- defining at least one work process goal for the at least one work process;
- generating, using a processor adapted to optimize a work schedule, a workflow for scheduling tasks associated with the graphically depicted work queues, the generated schedule defined by the at least one work process goal;
- unbinding a plurality of work queues for a predetermined number of work processes;
- and
- randomly selecting an unbound work queue and iteratively binding another unbound work queue to the selected unbound work queue and simulate the performance of the workflow to optimize the workflow schedule until all unbound work queues are rebound and the workflow schedule is optimized such that all work process goals are met.
A system for optimizing a workflow for scheduling work assignments, comprising:
- a processor;
- a graphical user interface;
- and
- a non-transitory computer readable medium programmed with computer readable code that upon execution by the processor causes the processor to:
- define a plurality of work queues, each work queue representative of a task to be completed;
- display the plurality of defined work queues in the graphical user interface;
- receive, from the graphical user interface, a selection of at least two work queues of the plurality of defined work queues;
- present a graphical indication of each of the selected work queues on the graphical user interface;
- create, in the graphical user interface, at least one directional graphical link between two of the at least two selected work queues, binding two of the at least two selected work queues;
- create at least one work process in the workflow by receiving, in the graphical user interface, a selection of at least two of the selected work queues;
- graphically depict each of the work processes with a unique color;
- define at least one work process goal for the at least one work process;
- generate, using a processor adapted to optimize a work schedule, a workflow for scheduling tasks associated with the graphically depicted work queues, the generated schedule defined by the at least one work process goal;
- unbind a plurality of work queues for a predetermined number of work processes;
- and
- randomly select an unbound work queue and iteratively binding another unbound work queue to the selected unbound work queue and simulate the performance of the workflow to optimize the workflow schedule until all unbound work queues are rebound and the workflow schedule is optimized such that all work process goals are met.
A method of optimizing a workflow for scheduling work assignments, the method comprising:
- providing a workforce management system, the workforce management system including a graphical user interface and a processor, wherein the graphical user interface is used to create workflows, further wherein the processor receives created workflows and optimizes the created workflows;
- defining a plurality of work queues, each work queue representative of a task to be completed;
- displaying the plurality of defined work queues in the graphical user interface;
- receiving, through the graphical user interface, a selection of at least two work queues of the plurality of defined work queues;
- presenting a graphical indication of each of the selected work queues on the graphical user interface;
- creating, in the graphical user interface, at least one directional graphical link between two of the at least two selected work queues, binding two of the at least two selected work queues;
- creating at least one work process in the workflow by receiving, in the graphical user interface, a selection of at least two of the selected work queues;
- graphically depicting each of the work processes with a unique color;
- defining at least one work process goal for the at least one work process;
- generating, using the processor adapted to optimize a work schedule, a workflow for scheduling tasks associated with the graphically depicted work queues, the generated schedule defined by the at least one work process goal;
- unbinding a plurality of work queues for a predetermined number of work processes;
- and
- randomly selecting an unbound work queue and iteratively binding another unbound work queue to the selected unbound work queue and simulate the performance of the workflow to optimize the workflow schedule until all unbound work queues are rebound and the workflow schedule is optimized such that all work process goals are met.
A system of optimizing a workflow for scheduling work assignments, comprising:
- a workforce management system, wherein the workforce management system includes:
- a graphical user interface used to create workflows;
- a processor that receives workflows from the graphical user interface and optimizes the created workflows;
- and
- a non-transitory computer readable medium programmed with computer readable code that upon execution by the processor causes the processor to:
- define a plurality of work queues, each work queue representative of a task to be completed;
- display the plurality of defined work queues in the graphical user interface;
- receive, through the graphical user interface, a selection of at least two work queues of the plurality of defined work queues;
- present a graphical indication of each of the selected work queues on the graphical user interface;
- create, in the graphical user interface, at least one directional graphical link between two of the at least two selected work queues, binding two of the at least two selected work queues;
- create at least one work process in the workflow by receiving, in the graphical user interface, a selection of at least two of the selected work queues;
- graphically depict each of the work processes with a unique color;
- define at least one work process goal for the at least one work process;
- generate, using the processor adapted to optimize a work schedule, a workflow for scheduling tasks associated with the graphically depicted work queues, the generated schedule defined by the at least one work process goal;
- unbind a plurality of work queues for a predetermined number of work processes;
- and
- randomly select an unbound work queue and iteratively binding another unbound work queue to the selected unbound work queue and simulate the performance of the workflow to optimize the workflow schedule until all unbound work queues are rebound and the workflow schedule is optimized such that all work process goals are met.
A method of optimizing a workflow for scheduling work assignments, the method comprising:
- defining a plurality of work queues, each work queue representative of a task to be completed;
- displaying the plurality of defined work queues in a graphical user interface;
- receiving, through the graphical user interface, a selection of at least two work queues of the plurality of defined work queues;
- presenting a graphical indication of each of the selected work queues on the graphical user interface;
- creating, in the graphical user interface, at least one directional graphical link between two of the at least two selected work queues, binding two of the at least two selected work queues;
- defining, with the graphical user interface, at least one constraint associated with at least one of the selected work queues or at least one of the created graphical directional links;
- creating at least one work process in the workflow by receiving, in the graphical user interface, a selection of at least two of the selected work queues, wherein the two work queues of the at least two selected work queues are connected by the at least one directional graphical link;
- graphically depicting each of the work processes with a unique color;
- defining at least one work process goal for the at least one work process;
- generating, using a processor adapted to optimize a work schedule, a workflow for scheduling tasks associated with the graphically depicted work queues, the generated schedule defined by the at least one constraint and the at least one work process goal;
- and
- simulating, with the processor, the performance of the generated workflow and optimizing the workflow until the simulation determines the workflow is optimized such that all constraints and work process goals are met by the optimized workflow.
A system for optimizing a workflow for scheduling work assignments, comprising:
- a processor;
- a graphical user interface;
- and
- a non-transitory computer readable medium programmed with computer readable code that upon execution by the processor causes the processor to:
- define a plurality of work queues, each work queue representative of a task to be completed;
- display the plurality of defined work queues in a graphical user interface;
- receive, through the graphical user interface, a selection of at least two work queues of the plurality of defined work queues;
- present a graphical indication of each of the selected work queues on the graphical user interface;
- create, in the graphical user interface, at least one directional graphical link between two of the at least two selected work queues, binding two of the at least two selected work queues;
- define, with the graphical user interface, at least one constraint associated with at least one of the selected work queues or at least one of the created graphical directional links;
- create at least one work process in the workflow by receiving, in the graphical user interface, a selection of at least two of the selected work queues, wherein the two work queues of the at least two selected work queues are connected by the at least one directional graphical link;
- graphically depict each of the work processes with a unique color;
- define at least one work process goal for the at least one work process;
- generate, using a processor adapted to optimize a work schedule, a workflow for scheduling tasks associated with the graphically depicted work queues, the generated schedule defined by the at least one constraint and the at least one work process goal;
- simulate, with the processor, the performance of the generated workflow and optimizing the workflow until the simulation determines the workflow is optimized such that all constraints and work process goals are met by the optimized workflow.
Dependencies are inferred from the claim text.