Time-Series Analysis for Forecasting Computational Workloads
AssigneeOracle International Corporation
InventorsAntony Stephen Higginson, Octavian Arsene, Mihaela Dediu, Thomas Elders
Life of this patent
Estimating the term…
Loading patent…
AssigneeOracle International Corporation
InventorsAntony Stephen Higginson, Octavian Arsene, Mihaela Dediu, Thomas Elders
Estimating the term…
Techniques for time-series analysis for forecasting computational workloads are disclosed. A resource management system monitors a computing system and obtains metrics data from the computing system. The metrics data is stored as a set of historical data points of a data set. A first portion of the set of historical data points comprise an outlier that does not correspond to a seasonality pattern associated with a second portion of the set of historical data points. The resource management system tests a first time-series model that incorporates a first exogenous variable corresponding to a first exogeneous factor to determine that the first time-series model fits both the first portion of the set of historical data points and the second portion of the set of historical data points within an error threshold. Then, the resource management system selects the first time-series model to predict future data points of the data set.
One or more non-transitory machine-readable media storing instructions which, when executed by one or more processors, cause:
The one or more non-transitory machine-readable media of claim 7, wherein the second time-series model does not include any exogenous variable.
A method, comprising:
An apparatus, comprising:
Dependencies are inferred from the claim text.