Predictive modelling and control for water resource infrastructure
AssigneeAutodesk, Inc.
InventorsThouheed Abdul GAFFOOR, Megh SUTHAR, Yousra Hazem Khalil Helmy MOHAMED
Life of this patent
Estimating the term…
Loading patent…
AssigneeAutodesk, Inc.
InventorsThouheed Abdul GAFFOOR, Megh SUTHAR, Yousra Hazem Khalil Helmy MOHAMED
Estimating the term…
A control mechanism scheduler for a water resource infrastructure receives operating data and disturbance data, the operating data describing infrastructure components of the water resource infrastructure, the disturbance data comprising a disturbance signal describing a disturbance expected to disturb the water resource infrastructure. The control mechanism scheduler generates classes for disturbance signals, generates simulations of the water resource infrastructure, and generates schedules of setpoints for control mechanisms actuable to control the infrastructure components of the water resource infrastructure in accordance with approaching a predetermined objective.
A system for training a control mechanism scheduler of a water resource infrastructure, the system comprising:
A system for generating a schedule of setpoints of control mechanisms of a water resource infrastructure, the system comprising:
Dependencies are inferred from the claim text.