Emergency disconnect system
AssigneeMaersk Drilling A/S
InventorAllan MCCOLL
Life of this patent
Estimating the term…
Abstract
A control system for controlling disconnection of riser system that extends between a vessel and a subsea location that comprises a wellbore, the riser system configured to receive a string in use, the control system being configured to disconnect the riser system according to a sequence of operations, the sequence of operations comprising disconnecting the riser system prior to or simultaneous with cutting the string and sealing the well bore.
Claims21
1-18. (canceled)
A control system for controlling disconnection of a riser system that extends between a vessel and a subsea location that comprises a wellbore, the riser system accommodating a string, wherein the control system is configured to:
- determine a critical condition of the riser system or the vessel;
- and
- disconnect the riser system in dependence of the determination according to a sequence of operations, the sequence of operations comprising disconnecting the riser system prior to or simultaneous with cutting the string and/or sealing the well bore.
A system comprising a lower blow out preventer (BOP) stack and a control system for controlling disconnection of a riser system that extends between a vessel and a subsea location that comprises a wellbore, the riser system accommodating a string,
- wherein the control system is configured to:
- determine a critical condition of the riser system or the vessel;
- and
- disconnect the riser system in dependence of the determination according to a sequence of operations, the sequence of operations comprising disconnecting the riser system prior to or simultaneous with cutting the string and/or sealing the well bore;
- wherein the lower blow out preventer (BOP) stack is configured to selectively couple with a lower marine riser package (LMRP), the lower blow out preventer (BOP) stack comprising at least at least one casing shear ram (CSR), the control system being configured to automatically trigger the operation of the at least one casing shear ram (CSR) to cut a string in the event of the lower marine riser package (LMRP) disconnecting from the lower blow out preventer (BOP) stack.
A method of controlling disconnection of a riser system that extends between a vessel and a subsea location that comprises a wellbore, the riser system accommodating a string, wherein the method comprising determining a critical condition of the riser system or the vessel and disconnecting the riser system in dependence of the determination prior to cutting the string and sealing the well bore.
Dependencies are inferred from the claim text.