Resource configuration change planning system and resource configuration change planning method
AssigneeHitachi, Ltd.
InventorsAtsumi TERAYAMA, Shinichi HAYASHI
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi, Ltd.
InventorsAtsumi TERAYAMA, Shinichi HAYASHI
Estimating the term…
A system includes a first processing unit that executes a first planning algorithm to evaluate a migration destination resource based on a difference between performance of a migration target resource and reference performance and output a first solution as a migration destination resource state string that indicates a configuration and performance of the migration destination resource that is evaluated as a migration destination, a second processing unit that executes a second planning algorithm to output a second solution according to a mathematical programming method as the migration destination resource state string for the evaluated migration destination resource and uses the first solution to correct the second solution, and a third processing unit that outputs, between the first solution satisfying a time limit and the corrected second solution, a solution in which quality of the resource configuration change plan is estimated and an evaluation value of the plan meets a condition.
A resource configuration change planning system that makes a resource configuration change plan for a computer system, the resource configuration change planning system comprising:
A resource configuration change planning method that makes a resource configuration change plan for a computer system, the resource configuration change planning method comprising:
Dependencies are inferred from the claim text.