Multi-time scale energy storage management framework for performance-based frequency regulation (fr) market
AssigneeHitachi, Ltd.
InventorsYanzhu YE, Bo YANG, Panitarn CHONGFUANGPRINYA, Sumito TOBE
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi, Ltd.
InventorsYanzhu YE, Bo YANG, Panitarn CHONGFUANGPRINYA, Sumito TOBE
Estimating the term…
The multi-time scale battery energy/storage system (BES) management framework proposed in the present disclosure can be used for day-ahead capacity scheduling and real-time BES operation control in the latest performance-based frequency regulation market. This multi-time scale BES management framework includes three control layers: long-term battery performance planning layer, day-ahead regulation capacity scheduling layer, real-time battery operation control layer. These three layers will coordinate with each other, and operate at different time scales.
A battery system management method, comprising:
A non-transitory computer readable medium, storing instructions for executing a process to manage a battery system, the instructions comprising:
An apparatus configured to manage a battery system, the apparatus comprising:
Dependencies are inferred from the claim text.