Management device, management method, and component mounting system
AssigneePanasonic Intellectual Property Management Co., Ltd.
InventorsTaichi SHIMIZU, Yosuke TAJIKA, Hiroshi AMANO, Yuichi HIGUCHI
Life of this patent
Estimating the term…
Loading patent…
AssigneePanasonic Intellectual Property Management Co., Ltd.
InventorsTaichi SHIMIZU, Yosuke TAJIKA, Hiroshi AMANO, Yuichi HIGUCHI
Estimating the term…
A management device for managing a component mounter that mounts components onto a substrate using some of constituent elements each selected from one of constituent element groups each including the constituent elements. One group is a nozzle group including nozzles. The device includes: a true displacement amount calculator that calculates, for each target component which is the component, a true amount of displacement which is a sum of (i) an amount of pickup displacement being an amount of displacement between the target component and a target nozzle being one of the nozzles and picks up the target component and (ii) an amount of correction being an amount of offset of a position of the target nozzle when picking up the target component; and a statistical processor that performs parameter estimation for a predetermined statistical model using the true amount to calculate a degree of malfunction of each constituent element.
A management device for managing a component mounter that mounts a plurality of components onto a substrate using some of a plurality of constituent elements each selected from one of a plurality of constituent element groups each including the plurality of constituent elements, one of the plurality of constituent element groups being a nozzle group including a plurality of nozzles, the management device comprising:
A management method of managing a component mounter that mounts a plurality of components onto a substrate using some of a plurality of constituent elements each selected from one of a plurality of constituent element groups each including the plurality of constituent elements, one of the plurality of constituent element groups being a nozzle group including a plurality of nozzles, the management method comprising:
Dependencies are inferred from the claim text.