Multi-slug staged plugging method applicable to fractured formation
AssigneeSouthwest Petroleum University
InventorsGao LI, Long HE, Zujun JIANG, Rui LI, Yi FENG
Life of this patent
Estimating the term…
Loading patent…
AssigneeSouthwest Petroleum University
InventorsGao LI, Long HE, Zujun JIANG, Rui LI, Yi FENG
Estimating the term…
A multi-slug staged plugging method applicable to a fractured formation includes the following steps: 1), determining an average opening of fractures around a well as D, performing first-stage plugging by using bridging particles having a particle size being slightly smaller than D and an average particle size represented as D1, and determining a particle size of each of the following stages of plugging particles sequentially to form a tight plugging layer; 2), injecting plugging slurry only containing bridging particles having an average particle size of D1 through slugs first to form a bridging particle layer; 3), injecting plugging slurry containing plugging particles having an average particle size of D2˜Dn-1 in several times through a plurality of slugs to form a particle filling layer; and 4), finally injecting plugging slurry containing plugging particles having an average particle size of Dn through the slugs to form a tight plugging layer.
A multi-slug staged plugging method applicable to a fractured formation, sequentially comprising the following steps:
Dependencies are inferred from the claim text.