Dynamic indication of higher order modulation and coding scheme table
AssigneeAT&T Intellectual Property I, L.P.
InventorsSaiRamesh Nammi, Arunabha Ghosh
Life of this patent
Estimating the term…
Abstract
The described technology is generally directed towards dynamically changing which quadrature amplitude modulation (QAM) table a user equipment is to use based on channel quality information. A network schedules a user equipment with 256 QAM modulation if the user equipment recommends 256 QAM in the CQI report (and the scheduler decides to use 256 QAM for that particular user equipment). The network indicates to the user equipment that it has to use 256 QAM modulation and coding scheme (MCS) table and not the configured QAM MCS table while determining the scheduling parameters by decoding PDCCH.
Claims20
A method, comprising:
- sending, by network equipment comprising a processor, scheduling information to a user equipment using a first downlink control channel;
- and
- indicating, to the user equipment by the network equipment via a second downlink control channel that is separate from a first downlink control channel, that the user equipment is to use an updated modulation and coding scheme data structure having a higher order than a current order of a previously configured modulation and coding scheme data structure used by the user equipment, wherein the second downlink control channel does not carry any scheduling information to the user equipment.
A system, comprising:
- a processor;
- and
- a memory that stores executable instructions that, when executed by the processor, facilitate performance of operations, the operations comprising:
- sending scheduling information to a user equipment using a first downlink control channel;
- and
- indicating, to the user equipment via a second downlink control channel that is separate from a first downlink control channel, that the user equipment is to use an first modulation and coding scheme having a higher order than a second modulation and coding scheme used by the user equipment, wherein the second downlink control channel does not carry any scheduling information to the user equipment.
A non-transitory machine-readable medium, comprising executable instructions that, when executed by a processor of network equipment, facilitate performance of operations, the operations comprising:
- sending scheduling information to a user equipment using a first downlink control channel;
- and
- indicating, to the user equipment via a second downlink control channel that is separate from a first downlink control channel, that the user equipment is to use a high order modulation and coding scheme having a higher order than a low order modulation and coding scheme used by the user equipment, wherein the second downlink control channel does not carry any scheduling information to the user equipment.
Dependencies are inferred from the claim text.