A method for mitigating flood or water flow, comprising steps of:
- assembling at least one aqueduct or drain supported by at least one pillar and pier,
- linking a first section of said aqueduct to a river, lake, reservoir, water retention pond or dam;
- and
- linking another section to a storage tank or sea,
- wherein, the positioning of the first section is higher than the other section, and placement of the aqueducts or drains is to be above-ground level or extend upward from sides of river or existing drain, such that invert levels of the aqueducts or drains are higher than sea levels during high tide-flooding or increased sea levels;
- wherein the positioning of the first section at higher elevation than the other section;
- wherein the other section positioned higher elevation than sea levels during high tide or flooding, such that the water is held to a certain flow and depth using the aqueduct that is extended along a path of an existing river or channel at elevated level above-ground of the aqueduct, for use of water-based recreational activity and transportation within the aqueduct.