Gas turbine load/unload path control
AssigneeGeneral Electric Company
InventorsJason Nathaniel Cook, Jason Dean Fuller, Christopher James Wenner
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Company
InventorsJason Nathaniel Cook, Jason Dean Fuller, Christopher James Wenner
Estimating the term…
A loading/unloading method for a gas turbine system is disclosed. The gas turbine system includes a combustion section featuring a primary combustion stage with a first plurality of fuel nozzles and a downstream, secondary combustion stage with a second plurality of fuel nozzles. For loading, the method progresses through each of a plurality of progressive combustion modes that sequentially activate a higher number of at least one of the first or second plurality of fuel nozzles; and for unloading, the method progresses through each of a plurality of progressive combustion modes that sequentially activate a lower number of at least one of the first or second plurality of fuel nozzles. During each combustion mode, regardless of whether loading or unloading, a primary combustion stage exit temperature of a combustion gas flow is controlled to be within a predefined target range corresponding to the respective combustion mode.
A loading/unloading method for a gas turbine (GT) system, the gas turbine system including a compressor feeding air to a combustion section that is coupled to a turbine, the combustion system including a plurality of combustors, each combustor including a primary combustion stage including a first plurality of fuel nozzles and a secondary combustion stage downstream from the primary combustion stage, the secondary combustion stage including a second plurality of fuel nozzles, the method comprising during unloading or loading of the GT system:
A gas turbine (GT) system, comprising:
A non-transitory computer readable storage medium including code for a control system of a gas turbine system, the code configured to control a combustion section including a plurality of combustors for a gas turbine system, each combustor including a primary combustion stage including a first plurality of fuel nozzles and a secondary combustion stage downstream from the primary combustion stage, the secondary combustion stage including a second plurality of fuel nozzles, the code performing the following during loading or unloading of the GT system:
Dependencies are inferred from the claim text.