A tensionless concrete pier foundation for supporting a tower and a method of constructing the same is provided, the foundation having an outer CMP and an inner CMP with an annular space therebetween in which a plurality of sleeved tower anchor bolts are embedded, at least the outer CMP having an upper edge that is flush with the top of the foundation after the tower has been installed. A method of plumbing a tower anchor bolt cage using a bolt alignment ring is also provided that includes coupling the upper ends of the CMPs together with lateral spacing bolts that extend across the annular space. The tower anchor bolt cage is suspended from the lateral spacing bolts by the bolt alignment ring, and the lateral spacing bolts are shimmed on a low side as necessary for leveling the alignment ring and plumbing the bolt cage, before concrete pour.
A tensionless concrete foundation for supporting a tower comprising a concrete pier in an excavation, said concrete pier including an outer CMP and an inner CMP having a smaller diameter than the outer CMP to define an annular space between the inner and outer CMPs when the CMPs are placed within the excavation, a plurality of sleeved anchor bolts embedded in said annular space and secured at their lower ends to an embedment ring adjacent a bottom of the concrete pier, the anchor bolts extending upwardly to above a top of the foundation, the top of the foundation being defined as an upper surface of the concrete forming the foundation when the foundation is complete, and at least said outer CMP having an upper edge that is flush with the top of the foundation.
A method of installing a concrete pier foundation comprising:
A method of constructing a tensionless concrete pier foundation having outer and inner CMPs with a tower anchor bolt cage embedded in an annular space between them, comprising reinforcing a position and spacing of the inner and outer CMPs within an excavation with a plurality of lateral steel reinforcement and spacing members that extend through the two CMPs and span said annular space, said lateral steel members including an upper set of lateral reinforcement and spacing members used to facilitate leveling of the tower anchor bolt cage during construction, said lateral steel reinforcement and spacing members providing bursting steel resistance, allowing for CMP location eccentricity adjustment, and being usable for lifting lug bolt connections, ends of the lateral steel members that extend beyond the inner and outer CMPs being usable for future retrofit and repowering additions while also providing for electrical grounding connection to the CMPs.
A tensionless concrete foundation for supporting a tower comprising:
A method of constructing a tensionless concrete pier foundation in an excavation, said concrete pier including an outer CMP and an inner CMP having a smaller diameter than the outer CMP to define an annular space between the inner and outer CMPs when the CMPs are placed within the excavation, the method of constructing comprising: