Cap for a Hydrocarbon Production Well and Method of Use
AssigneeTotal E&P Danmarks A/S
InventorMartin KASTER
Life of this patent
Estimating the term…
Abstract
A cap (100) for a hydrocarbon production well (700), said cap (100) having a body (105) with a top (100a) and a bottom (100b), the bottom (100b) having a first connecting flange (101) with a first seal face (102), the first connecting flange (101) configured to connect to an end flange (201, 301) of a wellhead component (200, 300), the top (100a) having a second connecting flange (103) with a second seal face (104). There is also provided a wellhead component (200, 300), a method for entering a hydrocarbon production well (700), and a method for enabling re-entry into a hydrocarbon production well (700).
Claims20
A cap for a hydrocarbon production well, said cap having a body with a top and a bottom, the bottom having a first connecting flange with a first seal face, the first connecting flange configured to connect to an end flange of a wellhead component, the top having a second connecting flange with a second seal face.
Dependencies are inferred from the claim text.