Methods and systems for determining distribution grid hosting capacity
AssigneesCommonwealth Edison Company, University of Denver
InventorsAmin Khodaei, Shay Bahramirad, Aleksi Paaso
Life of this patent
Estimating the term…
Loading patent…
AssigneesCommonwealth Edison Company, University of Denver
InventorsAmin Khodaei, Shay Bahramirad, Aleksi Paaso
Estimating the term…
Methods and systems for determining a hosting capacity in a distribution grid are disclosed herein. The methods and systems may use optimization models that consider operating conditions of a distribution grid having a distinct topology, characteristics, and predetermined performance parameters. The determination of a hosting capacity may first consider a lossless power flow model for the distribution grid, which may then be used to arrive at a maximum hosting capacity for the distribution grid. The maximum hosting capacity may be defined as the total capacity of a number of distributed generators connected to the distribution grid such that the performance parameters will be met.
A method comprising:
An apparatus comprising:
The apparatus of 9, wherein the computer-executable instructions that cause the apparatus to determine, based on the lossless power flow model, a maximum hosting capacity of the radial distribution grid comprise instructions to cause the apparatus to:
The apparatus of 9, further comprising computer-executable instructions that cause the apparatus to:
A method comprising:
The method of 17, wherein the set of performance parameters for the radial distribution grid comprises predetermined electrical loads transmitted by distribution lines associated with the plurality of distribution buses and predetermined voltage magnitudes for the plurality of distribution buses.
The method of 17, wherein each of the distributed generators are a solar photovoltaic panel, a wind turbine, or a diesel generator.
Dependencies are inferred from the claim text.