Coordinated frequency load shedding protection method using distributed electrical protection devices
AssigneeS&C Electric Company
InventorJoseph Matamoros
Life of this patent
Estimating the term…
Loading patent…
AssigneeS&C Electric Company
InventorJoseph Matamoros
Estimating the term…
A method for providing frequency load shedding in a power distribution network. The network includes a number of distributed switch-gear assemblies that control whether AC power is provided to groups of loads. The distributed switch-gear assemblies monitor the frequency of the AC signal to determine if a frequency event is occurring and also determine the direction of the power flow at the time of the event. The switch-gear assembly may open in an underfrequency event only if the loads are drawing power from the network, and the switch-gear assembly may open in an overfrequency event only if there is reverse power flow during the event. In addition, the order of operation of which switch-gear assemblies may open first in response to the frequency event is determined in advance by the location of the switch-gear assembly in the network and a corresponding time delay and coordinated frequency set-points.
A method for shedding load in response to an underfrequency event in an electrical power distribution network, wherein an AC power signal from a power source flows on at least one electrical line through a plurality of switch-gear assemblies to a plurality of groups of loads provided among and between the switch-gear assemblies, each group of loads including a plurality of individual loads that may combine to be drawing power from the network or providing power to the network at any particular point in time, the method comprising:
A method for shedding load in response to an underfrequency event in an electrical power distribution network, wherein an AC power signal from a substation flows on a feeder or lateral electrical line through a plurality of switch-gear assemblies to a plurality of groups of loads provided among and between the switch-gear assemblies, each group of loads including a plurality of individual loads that may combine to be drawing power from the network or providing power to the network at any particular point in time, the method comprising:
A method for shedding load in response to an underfrequency event in an electrical power distribution network, wherein an AC power signal from a power source flow on at least one electrical line through a plurality of switch-gear assemblies to a plurality of groups of loads provided among and between the switch-gear assemblies, the method comprising: