Procedure and system for the calculation of the level of risk in the proximity of the excavation front of an underground work
AssigneeSws Engineering S.P.A.
InventorsAndrea Danzi, Gabriele Eccher
Life of this patent
Estimating the term…
Loading patent…
AssigneeSws Engineering S.P.A.
InventorsAndrea Danzi, Gabriele Eccher
Estimating the term…
The system for the calculation of the level of risk in the proximity of the excavation front of an underground work comprises a determination and storage unit for the determination of a plurality of basic parameters needed for the calculation of the level of risk in the proximity of the excavation front of the underground work, starting from a plurality of documents in electronic format, and for the structured storage of the basic parameters inside a database; a definition unit of a plurality of scenarios which could occur in the proximity of an excavation front of the underground work, starting from the basic parameters stored on the database; an application unit, for each of the scenarios generated during the definition phase, of predefined geo-mechanical and hydro-geological models, for the calculation of a series of possible embodiments for each scenario; an aggregation unit for the aggregation of punctual evaluations of the level of risk for each possible embodiment, to obtain a synthesis of the risk calculated in the proximity of the excavation front of the underground work.
A system (S) for the calculation of the level of risk in the proximity of the excavation front of an underground work, wherein it comprises:
A procedure (P) for the calculation of the level of risk in the proximity of the excavation front of an underground work, comprising at least one of the following phases: