Scheduling method, power control method, and base station
AssigneeHuawei Technologies Co., Ltd.
InventorZhihua TANG
Life of this patent
Estimating the term…
Abstract
A power control method and a base station are provided. The base station obtains a first resource block (RB) set and a second RB set after a power control cycle arrives, wherein the first RB set is an RB set that is allocated by the first base station to first user equipment (UE) in a first cell at each transmission time interval (TTI) in the power control cycle, and the second RB set is an RB set that is allocated by a second base station to second UE in a second cell at each TTI in the power control cycle. Then the base station performs power control on the first UE based on the first RB set and the second RB set.
Claims10
A power control method, wherein the method comprises:
- obtaining, by a first base station, a first resource block (RB) set and a second RB set after a power control cycle arrives, wherein the first RB set is an RB set that is allocated by the first base station to first user equipment (UE) in a first cell at each transmission time interval (TTI) in the power control cycle, and the second RB set is an RB set that is allocated by a second base station to second UE in a second cell at each TTI in the power control cycle;
- and
- performing, by the first base station, power control on the first UE based on the first RB set and the second RB set.
A base station, wherein the base station comprises:
- a processor;
- and
- a memory coupled to the processor for storing computer-executable instructions, wherein the computer-executable instructions, when executed by the processor, cause the base station to:
- obtain a first resource block (RB) set and a second RB set after a power control cycle arrives, wherein the first RB set is an RB set that is allocated by the first base station to first user equipment (UE) in a first cell at each transmission time interval (TTI) in the power control cycle, and the second RB set is an RB set that is allocated by a second base station to second UE in a second cell at each TTI in the power control cycle;
- and
- perform power control on the first UE based on the first RB set and the second RB set.
Dependencies are inferred from the claim text.