Control of a wind turbine during recovery after a grid fault
AssigneeVestas Wind Systems A/S
InventorsMartin Ansbjerg KJÆR, Kasper Zinck OSTERGAARD, Jan GRAUGAARD-JENSEN
Life of this patent
Estimating the term…
Loading patent…
AssigneeVestas Wind Systems A/S
InventorsMartin Ansbjerg KJÆR, Kasper Zinck OSTERGAARD, Jan GRAUGAARD-JENSEN
Estimating the term…
Embodiments of the present invention relate to control of a wind turbine during a recovery period after a grid fault. It is disclosed to operate a wind turbine during the recovery period to determine the actual pitch angle of the rotor blades and the actual wind speed, and based on that determining a desired pitch angle of the rotor blades, as well as a pitch ramp rate so that the actual pitch angle can be brought to match the desired pitch angle before the end of the recovery period. In embodiments, the steps performed in the recovery mode are repeated at intervals during the recovery period.
A method for controlling a wind turbine connected to a utility grid, wherein the wind turbine comprises rotor blades, the method comprising:
A control system for a wind turbine, the control system comprises at least one processor for:
A wind turbine comprising a control system wherein the control system comprises at least one processor configured to perform an operation comprising:
(canceled)
A computer program product comprising software code adapted to control a wind turbine when executed on a data processing system, the computer program product being adapted to control the wind turbine according to an operation comprising:
Dependencies are inferred from the claim text.