Back to results
US 2018/0245582 A1Published application
Pipe device including slam mitigating means
AssigneesJae Gu YANG, Flowtech Co., Ltd., Ji Suk YANG
InventorsJae Gu YANG, Ji Suk YANG, Jae Wook OH, Jai Youl YANG
Life of this patent
Estimating the term…
Abstract
The present invention relates to a water piping system, and more particularly, to a water piping system configured to reduce slam and water hammer of a check valve through delay of backflow of fluid by ejecting water stored in a pressure tank to a fluid forward direction at a high pressure when a pump in the water pipe is suddenly stopped, and through inducement of complete closure of the check valve by reducing a pressure applied to the check valve.
Claims30
A water piping system, the water piping system comprising:
- a pump configured to apply pressure on a fluid to a forward direction;
- a main pipe configured to move the fluid pressurized by the pump;
- a check valve configured to open or close the main pipe, and arranged at a discharge side of the pump;
- a pressure tank connected to the main pipe, arranged at a discharge side of the check valve, configured to be operated under a first status introducing the fluid of the main pipe into an inside of the pressure tank in response to a pressure difference between the pressure tank and the main pipe, and configured to be operated under a second status discharging the fluid to the main pipe in response to a pressure difference between the pressure tank and the main pipe;
- a connection pipe connecting the pressure tank to the main pipe;
- and
- a slam reduction means disposed with a first wall portion,
- wherein the first wall portion restricts the fluid of the pressure tank from being discharged into a backward direction which is an opposite direction of the forward direction when the fluid of the pressure tank is discharged into an inside of the main pipe under the second status,
- wherein the first wall portion discharges the fluid of the pressure tank to the forward direction when the fluid of the pressure tank is discharged into an inside of the main pipe under the second status,
- and wherein the first wall portion is arranged inside the main pipe.
7 more elements
Dependencies are inferred from the claim text.