System and method for analyzing timesheet data
AssigneeHCL Technologies Limited
InventorsSatya Sai Prakash KANAKADANDI, S U M Prasad DHANYAMRAJU
Life of this patent
Estimating the term…
Abstract
System and method for analyzing timesheet data to derive serendipitous insights are disclosed. Timesheet data for a plurality of employees working on multiple projects may be stored. The timesheet data may be analyzed to generate project insights associated with project tasks, for each of the plurality of employees. Priority scores for each of the project tasks may be calculated based on the project insights. Further, a dependency factor of the project task with respect to an outcome of the project may be evaluated.
Claims8
A system comprising:
- a memory;
- and
- a processor coupled to the memory, wherein the processor is configured to execute instructions stored in the memory to:
- store timesheet data for a plurality of employees assigned to a project;
- analyze the stored timesheet data to:
- determine, for at least one employee, at least one project task being performed;
- and
- identify, at least one project insight for the at least one employee, wherein the project insight comprising at least a time billed against the at least one project task and a total time billed for the project;
- generate, based on the at least one project insight, a priority score for the at least one project task;
- and
- evaluate, based on the priority score, a dependency factor of the at least one project task on an outcome of the project.
A method comprising:
- storing timesheet data for a plurality of employees assigned to a project;
- analyzing the stored timesheet data to:
- determine, for at least one employee, at least one project task being performed;
- and
- identify, at least one project insight for the at least one employee, wherein the project insight comprising at least a time billed against the at least one project task and a total time billed for the project;
- generating, based on the at least one project insight, a priority score for the at least one project task;
- and
- evaluating, based on the priority score, a dependency factor of the at least one project task on an outcome of the project.
The method of claim 6, further comprising:
- determining a project task being performed by the plurality of employees;
- identifying project insights for the plurality of employees, wherein the project insights at least comprising time billed against the project task by each of the plurality of employees and a total time billed for the project by each of the plurality of employees;
- computing, based on the project insights, priority scores of the project task, for the plurality of employees;
- and
- generating, based on the priority scores, a similarity score for two or more employees from the plurality of employees.
Dependencies are inferred from the claim text.