Method of development of a deposit of high-viscosity oil or bitumen
AssigneeTal Oil Ltd.
InventorRavil Rustamovich IBATULLIN
Life of this patent
Estimating the term…
Loading patent…
AssigneeTal Oil Ltd.
InventorRavil Rustamovich IBATULLIN
Estimating the term…
The invention relates to methods for the development of high-viscosity oil reservoirs with horizontal wells in the thermal impact on the reservoir. The method of developing deposits of high-viscosity oil or bitumen is carried out using a pair of horizontal injection and production wells, horizontal sections of which are arranged in parallel one above the other in a productive reservoir. The wells are equipped with tubing strings that allow simultaneous injection of a heat-transfer agent and extraction of the product. The method includes the steps of injecting the heat-transfer agent, heating the productive reservoir with the creation of a steam chamber, extracting the product by pumps from the lower production well through the tubing strings, the ends of which are located on opposite ends of the conventionally horizontal section of the well, determining mineralization of the produced water, determining the dependence of the uniformity of the steam chamber heating on changing the mineralization of water, and controlling the injection mode of the heat-transfer agent or extraction of he products from the wells to achieve a stable value of mineralization of the produced water ensuring uniform heating of the steam chamber. According to the invention, before the formation of the wells in the development test well or during the formation of the wells, core samples are selected for analyzing water mineralization and determining composition of dissolved elements. Based on these data, the optimum mineralization is determined in order to maximize oil recovery from the reservoir. After warming up of the reservoir and creating a steam chamber, the mineralization of produced water is determined at least once a day by directly measuring in the stream of the product. After reaching a stable value of mineralization of the produced water, the injection of the heat-transfer agent in the injection well and the withdrawal of the product from the production well without break of the heat-transfer agent in the production well is controlled so that the mineralization of the water is as much as possible close to the optimum value. The method allows to increase oil production by increasing the number of analyzes of the water mineralization and bringing the mineralization of the simultaneously extracted water to the optimum value.
A method of developing reservoir of high-viscosity oil or bitumen using a pair of horizontal injection and production wells having horizontal sections, which are placed parallel one above the other in a productive reservoir, said wells being equipped with tubing strings that allow for simultaneous injection of a heat-transfer agent and extraction of products, said method including the following steps of:
Dependencies are inferred from the claim text.