Pressure Cycle Actuated Injection Valve
AssigneeTejas Research & Engineering, LLC
InventorsJason C. Mailand, Thomas G. Hill, JR.
Life of this patent
Estimating the term…
Abstract
A method and apparatus for completing a well that includes a subsurface barrier valve utilizes an injection valve which includes a variable orifice insert. The injection valve includes a mechanism for sensing pressure cycles that are employed during various well completion operations including pressure testing. The mechanism includes an indexing sleeve which will disable pressure functionality. Once this occurs, pressure cycling to open the barrier valve can proceed. Once the barrier valve opens, flow alone controls the injection valve during normal operations.
Claims11
An injection valve for use in completing an oil and or gas well comprising;
- a) a housing,
- b) an axially movable piston located in a chamber provided in the housing,
- c) an upper indexing sleeve having a plurality of groove segments on an outer surface of the indexing sleeve,
- d) an upper flow tube axially movable within the housing,
- e) a power spring compressed by downhole movement of the upper flow tube,
- f) a lower indexing sleeve having a plurality of groove segments on an outer surface of the lower indexing sleeve,
- g) a first valve including a flapper element and a valve seat at a downhole portion of the housing, and
- h) a variable orifice insert positioned within the housing and including a second valve having a second valve body and second valve seat, the second valve being biased to a closed position.
A method of completing a well which includes a blowout preventer, a barrier valve and a polished bore receptacle comprising;
- a) providing an injection valve which includes a variable orifice insert having open, bypass and closed modes, the injection valve including a flapper valve and a mechanism for recognizing pressure cycles,
- b) providing a stab at a lower end of the injection valve and providing a tubular at an upper end of the injection valve,
- c) positioning and sealing the stab within the polished bore receptacle,
- d) applying pressure to the barrier valve and then relieving the pressure thereby closing the flapper valve,
- e) applying pressure between the injection valve and the barrier valve and monitoring the pressure to confirm dual barrier integrity,
- f) removing the blowout preventer from the well,
- g) installing a production tree on the well,
- h) opening the flapper valve by increasing the tubular string pressure,
- i) applying pressure cycles to the barrier valve as needed,
- j) applying a final pressure cycle to open the barrier valve.
Dependencies are inferred from the claim text.