Construction machine
AssigneeHitachi Construction Machinery Co., Ltd.
InventorsSeiji HIJIKATA, Kouji ISHIKAWA, Yasutaka TSURUGA, Masatoshi HOSHINO, Kiwamu TAKAHASHI
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi Construction Machinery Co., Ltd.
InventorsSeiji HIJIKATA, Kouji ISHIKAWA, Yasutaka TSURUGA, Masatoshi HOSHINO, Kiwamu TAKAHASHI
Estimating the term…
The construction machine includes: a control valve that switchingly supplies hydraulic fluid from a hydraulic pump to a hydraulic actuator; a control valve drive device that supplies pilot secondary hydraulic fluid to the control valve in accordance with an operation of an operation lever device; a pilot hydraulic pump that supplies pilot primary hydraulic fluid to the control valve drive device; a pressure accumulation device that recovers return hydraulic fluid returned from the hydraulic actuator. The construction machine further includes: a check valve provided in a line between the pilot hydraulic pump and the control valve drive device; a pressure reducing valve that supplied the hydraulic fluid accumulated in the pressure accumulation device; a flow rate reduction device; and a controller that controls the flow rate reduction device in accordance with the pressure in the line between the check valve and the control valve drive device.
A construction machine comprising:
Dependencies are inferred from the claim text.