Methods for preserving zonal isolation within a subterranean formation
AssigneeSuncor Energy Inc.
InventorGrant DUNCAN
Life of this patent
Estimating the term…
Abstract
There is provided a method for effecting at least partial interference of a fluid passage extending between a casing, disposed within a wellbore that is penetrating a subterranean formation, and the subterranean formation. The method includes detecting the fluid passage, and effecting an operative displacement of a casing section of the casing such that at least partial interference of the fluid passage is effected.
Claims43
A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating the subterranean formation, and wherein zonal isolation material is disposed between the casing and the subterranean formation, comprising:
- in response to detecting of the fluid passage extending between the casing and the subterranean formation, effecting an operative displacement of a section of the casing such that the at least partial interference of the fluid passage is effected;
- and
- effecting opposition to an elastic contraction of the displaced casing section for mitigating reversion of the displaced casing section towards its original position prior to the operative displacement.
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating a subterranean formation, and wherein zonal isolation material is disposed between the casing and the subterranean formation, comprising:
- deploying a tool within the wellbore;
- effecting an operative displacement of a section of the casing with the tool such that the at least partial interference of the fluid passage extending between the casing and the subterranean formation is effected;
- and
- effecting opposition to an elastic contraction of the displaced casing section for mitigating reversion of the displaced casing section towards its original position prior to the operative displacement.
(canceled)
(canceled)
23-25. (canceled)
28-37. (canceled)
A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating a subterranean formation, and wherein cement is disposed between the casing and the subterranean formation, comprising:
- deploying a tool including a split ring within the wellbore;
- expanding the split ring against a casing section to effect an operative displacement of the casing section to a displaced position, wherein, upon the casing section becoming displaced to the displaced position, the cement becomes disposed opposite to a subterranean formation portion that is relatively impermeable and effects the at least partial interference of the fluid passage;
- and
- effecting retention of the casing section in the displaced position, or in substantially the displaced position, with the expanded split ring.
A method for effecting at least partial interference of a fluid passage extending between a casing and a subterranean formation, wherein the casing is disposed within a wellbore that is penetrating a subterranean formation, and wherein cement is disposed between the casing and the subterranean formation, comprising:
- deploying a tool including a sleeve and a mandrel, wherein the sleeve is configured to be deflected in response to relative movement between the mandrel and the sleeve along their respective tapered surfaces;
- and
- actuating relative movement between the mandrel and the sleeve along their respective tapered surfaces such that the sleeve is deflected and the deflected sleeve is pressed against the casing section such that an operative displacement of the casing section is effected, wherein, upon the casing section becoming displaced to the displaced position, the cement becomes disposed.
A method for occluding a gap between a casing of a wellbore and a formation, the method comprising:
- identifying the presence of the gap between the casing's external surface and the formation;
- deploying an expansion tool within the casing;
- and
- applying an outward force against the casing with the expansion tool, to expand and operatively displace the casing radially outwards to occlude the gap.
A method for restoring zonal isolation in a cased and cemented portion of a thermally operated well in a formation, the method comprising:
- detecting the presence of a gap extending between the casing and the formation;
- deploying an expansion tool within a section of the casing;
- and
- effecting an operative and radially outward displacement of the casing section to occlude the gap.
Dependencies are inferred from the claim text.