Risk assessment for drilling and well completion operations
AssigneeHartford Steam Boiler Inspection and Insurance Company
InventorRichard B. Jones
Life of this patent
Estimating the term…
Loading patent…
AssigneeHartford Steam Boiler Inspection and Insurance Company
InventorRichard B. Jones
Estimating the term…
A method, apparatus and system is provided for assessing risk for well completion, comprising: obtaining, using an input interface, a Below Rotary Table hours and a plurality of well-field parameters for one or more planned runs, determining, using at least one processor, one or more non-productive time values that correspond to the one or more planned runs based upon the well-field parameters, developing, using at least one processor, a non-productive time distribution and a Below Rotary Table distribution via one or more Monte Carlo trials; and outputting, using a graphic display, a risk transfer model results based on a total BRT hours from the Below Rotary Table and the non-productive time distribution produced from the one or more Monte Carlo trials.
A method for assessing risk for well completion, comprising:
An apparatus for estimating actual downtimes from drilling operations using a risk transfer model, comprising:
A system comprising:
A method, system, and apparatus magnetically detecting equipment external to a downhole pipe prior to performing certain well operations as shown and described.
Dependencies are inferred from the claim text.