Designing Wellbore Completion Intervals
AssigneeHalliburton Energy Services, Inc.
InventorsRichard James Langenwalter, Harold Grayson Walters
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsRichard James Langenwalter, Harold Grayson Walters
Estimating the term…
In some aspects, completion interval attributes are designed for wellbore intervals based on the stratigraphic positions of the respective wellbore intervals. The completion interval attributes can be determine by a completion design system that associates resource production attributes with distinct combinations of stratigraphic positions and completion interval attributes. In some aspects, the completion design system includes a correlation database generated by a correlation engine. The correlation engine can generate the correlation data based on production data and wellbore interval data from another wellbore.
A method of analyzing well system completions, the method comprising:
A method of designing a completion for a well system in a subterranean region, the method comprising:
A system comprising:
Dependencies are inferred from the claim text.