Permeable Lost Circulation Drilling Liner
AssigneeSaudi Arabian Oil Company
InventorsJohn Timothy Allen, Brett Bouldin
Life of this patent
Estimating the term…
Loading patent…
AssigneeSaudi Arabian Oil Company
InventorsJohn Timothy Allen, Brett Bouldin
Estimating the term…
A layer of permeable material is positioned on m area of lost circulation lithology in a wellbore. An example of the permeable material includes a planar member with perforations that is rolled into and retained in an annular configuration. The permeable material is lowered into the wellbore adjacent the area of lost circulation and allowed to unroll and expand radially outward against walls of the wellbore. The wellbore wall along the area of lost circulation lithology can be reamed out so the layer of permeable material is out of the way of a drill bit. Applying a bridging agent on the interface where the permeable material contacts the wellbore wall forms a flow barrier.
A method of operations in a wellbore having a lost circulation zone comprising:
A method of wellbore operations comprising:
Dependencies are inferred from the claim text.