Continuous Downlinking While Drilling
AssigneeSchlumberger Technology Corporation
InventorsEdward George Parkin, Christopher C. Bogath
Life of this patent
Estimating the term…
Abstract
A method for continuous downlinking from a surface location to a bottom hole assembly includes using a bottom hole assembly to drill a subterranean wellbore. A drilling value is acquired at a surface location while drilling. The acquired drilling value is downlinked from the surface location to the bottom hole assembly. This process is continuously repeated while drilling.
Claims22
A method for downlinking acquired values from a surface location to a bottom hole assembly, the method comprising:
- (a) causing the bottom hole assembly to drill a subterranean wellbore;
- (b) acquiring a drilling value at a surface location;
- (c) downlinking the drilling value acquired in (b) from the surface location to the bottom hole assembly;
- and
- (d) continuously repeating (b) and (c) while drilling in (a).
A method for downlinking information from a surface location to a bottom hole assembly, the method comprising:
- (a) establishing a mathematical relationship between an acquired drilling value to be downlinked and a drilling parameter to be controlled, wherein the mathematical relationship is a repeating function;
- (b) causing the bottom hole assembly to drill a subterranean wellbore;
- (c) measuring the drilling value at a surface location;
- (d) controlling the drilling parameter while drilling to encode the drilling value according to the relationship established in (a);
- (e) measuring the drilling parameter downhole;
- and
- (f) processing the drilling parameter measured in (e) to compute the drilling value downhole.
A method for downlinking information from a surface location to a bottom hole assembly, the method comprising:
- (a) establishing a periodic mathematical relationship between a measured rate of penetration while drilling to be downlinked and a drill string rotation rate to be controlled;
- (b) selecting a nominal drill string rotation rate;
- (c) causing the bottom hole assembly to drill a subterranean wellbore;
- (d) measuring the rate of penetration at a surface location;
- (e) controlling the drill string rotation rate while drilling in (c) to encode the rate of penetration in a difference between the drill string rotation rate and the nominal drill string rotation rate selected in (b).
- (f) measuring the drill string rotation rate at the surface;
- (g) processing the drill string rotation rate measured in (f) to obtain an estimate of the rate of penetration computed downhole at (j);
- (h) processing the estimate of the rate of penetration obtained in (g) in a feedback loop to improve control of the drill string rotation rate in (e);
- (i) measuring the drill string rotation rate downhole;
- (j) processing the drill string rotation rate measured in (i) to compute the rate of penetration downhole;
- (k) uplinking the rate of penetration computed in (j) to the surface location;
- and
- (h) processing said rate of penetration uplinked in (k) in a feedback loop to improve control of the drilling parameter in (e).
Dependencies are inferred from the claim text.