Method and facility for manufacturing a continuous wall in the ground
AssigneeSoletanche Freyssinet
InventorsBertrand STEFF DE VERNINAC, Sabine DARSON-BALLEUR, Florence RENALIER, Michel COUDRY
Life of this patent
Estimating the term…
Loading patent…
AssigneeSoletanche Freyssinet
InventorsBertrand STEFF DE VERNINAC, Sabine DARSON-BALLEUR, Florence RENALIER, Michel COUDRY
Estimating the term…
The invention relates to an installation (10) for making a continuous wall in ground (S), the installation comprising: an excavation machine (14) having a frame (16) with a bottom end (16b); determination means (80) for periodically determining the offset between the frame and a first screen while making a second screen in the ground juxtaposed with the first screen; and correction means (50) for periodically correcting the position of the frame (16) so as to reduce the offset as determined by the determination means between the frame (16) and the first screen (E1), and maintain overlap between the longitudinal side of the frame and the longitudinal side of the first screen in such a manner that the second screen is secant with the first screen (E1) over the entire length of the shorter of the first and second screens, thereby forming the wall that is continuous.
1-15. (canceled)
A method of making a continuous wall in ground, the method comprising:
An installation for making a continuous wall in ground, the installation comprising:
Dependencies are inferred from the claim text.