According to the method, at least one carbon fibre-reinforced polymer band is joined to the steel structure at the end regions thereof, capable of transferring tensile forces. Subsequently, at least one lifting element (7) disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced in a region between these end anchorages (5), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4). So, a tensile force stress is generated between the end regions of the carbon fibre-reinforced polymer band (4). Then, a steel girder treated in such a manner includes at least one carbon fibre-reinforced polymer band, which is each joined to the steel structure (1) at the end regions thereof, capable of transferring tensile forces. In the region between these end regions, a lifting element (7) is disposed between the carbon fibre-reinforced polymer band (4) and the steel girder (3) to be reinforced, by means of which the carbon fibre-reinforced polymer band (4) is subjected to tensile stress by lifting away from the steel girder (3). The tensile force is transferred to the steel girder (3) via the anchoring elements (5).
Method for pre-stressing a steel structure, in which at least one carbon fiber-reinforced polymer band (4) each is loosely joined to a steel girder of the steel structure (1) to be reinforced at the end regions thereof with end anchorages (5) in the form of clamping shoes purely based on friction forces and without gluing, capable of transferring tensile forces, and subsequently, in a region between these end anchorages (5), at least one hydraulically, pneumatically, electrically or mechanically operated lifting element (7) disposed between the respectively carbon fibre-reinforced polymer band (4) and the steel girder to be reinforced (3,8), is extended substantially perpendicular to the carbon fibre-reinforced polymer band (4) above the tensile stress to be finally achieved for generating several 10 kN lifting force and the lifting of the polymer band (4) by means of a mechanical latch is secured, then supports are placed between the polymer band (4) and the steel structure and subsequently the lifting element (7) is relieved again, so that the target stress is achieved and the supporting force is absorbed by the supports for providing a permanent tensile force stress between the end regions of the respective carbon fibre-reinforced polymer band (4).
Steel structure, characterized in that at least one carbon fibre-reinforced polymer strip (4) each is joined to a steel girder of the steel structure (1) to be reinforced at the end regions thereof, capable of transferring tensile forces, wherein at least one lifting element (7) disposed between the respective carbon fibre-reinforced polymer band (4) and the steel girder (3,8) to be reinforced in the region between these end regions, by means of which the respective carbon fibre-reinforced polymer band (4) is subjected to tensile stress from the steel girder (3,8) by substantially perpendicular lifting of the carbon fibre-reinforced polymer band (4) and supports are inserted between the polymer band (4) and the steel structure on both the sides of the lifting element (7).
Dependencies are inferred from the claim text.