Back to results
US 2015/0178138 A1Published application
Multi-core dynamic workload management
AssigneeQUALCOMM Incorporated
InventorsJuhi Saha, Hee Jun Park, Alex Kuang-Hsuan Tu, Thomas Andrew Morison, Tao Xue, Ron Alton
Life of this patent
Estimating the term…
Abstract
A dynamic scheduler is provided that schedules tasks for a plurality of cores based upon current operating characteristics for the cores. The current operating characteristics include a predicted leakage current for each core based upon an analytical model.
Claims20
A system comprising:
- a plurality of cores;
- an analytic core power and thermal modeler configured to analytically model a leakage power for each core based upon the cores' native leakage currents and current temperatures and to model a dynamic power for each core based upon a current voltage and clock frequency for each core, and
- a dynamic scheduler further configured to schedule tasks for the cores based upon the modeled leakage powers and dynamic powers.
The system of claim 8, wherein the dynamic scheduler is further configured to schedule the tasks based upon an expected task time duration for each task.
A method, comprising:
- determining a projected leakage current for each core in a plurality of cores, wherein the determination is responsive to an analytical model that depends upon a native leakage current for each core and a temperature of each core;
- comparing the projected leakage currents to determine a core that has a lowest projected leakage current;
- and
- scheduling the core with the lowest projected leakage current for a first task.
1 more element
A multi-core system comprising:
- a plurality of cores;
- and
- means for scheduling tasks for the cores based upon an analytical model of the leakage current predicted for the cores that depends upon a temperature for each core, wherein the means for scheduling is configured to select a core with lowest predicted leakage current for tasks corresponding to idle-use cases.
Dependencies are inferred from the claim text.