A method of casting in-situ a ferrocement ribbed slab through a spliced rack and a suspended formwork, comprising steps of:
- step 1) of prefabricating a transverse plane truss girder, an incomplete longitudinal plane truss girder and an incomplete longitudinal plane truss in a factory, wherein the transverse plane truss girder, the incomplete longitudinal plane truss girder and the incomplete longitudinal plane truss are configured to be spliced to a mesh truss in constructing in-situ, and a width D and a height H of the mesh truss are selected according to span and load bearing requirements of a floor slab,
- fabricating the transverse plane truss girder with the height H, the incomplete longitudinal plane truss girder with the height H and the incomplete longitudinal plane truss with the height H by using an automatic truss welding machine, where the length of the transverse plane truss girder is equal to the width D;
- step 2) of making a bottom formwork:
- wherein the bottom formwork is made of light material with a good fire resistant and soundproof performance, and is reinforced for a large construction load by increasing the strength of the bottom formwork or adding a steel mesh within the bottom formwork considering requirements of the construction load;
- step 3) of splicing and constructing a mesh truss on site:
- wherein, the transverse plane truss girders (1) are placed in position according to spacing requirements of the mesh truss and fixedly connected with a beam or a wall, thereby maintaining the transverse plane truss girder horizontal,
- subsequently the incomplete longitudinal plane truss girders are fixed on each of the transverse plane truss girders perpendicularly to the transverse plane truss girders and connected to the beam or wall, wherein the spacing between the adjacent incomplete longitudinal plane truss girders are conform to the spacing requirements of the mesh truss,
- then the incomplete longitudinal plane trusses are arranged below and spliced with the incomplete longitudinal plane truss girders,
- lastly, the transverse plane truss girder, the incomplete longitudinal plane truss girders and the incomplete longitudinal plane trusses are fixedly connected at intersections therebetween;
- step 4) of suspending the bottom formworks:
- wherein the bottom formworks are suspended and installed below the mesh truss through connectors, and a gap between the bottom formworks is filled, and the spacing between the bottom formworks meets the sectional requirement of the ferrocement ribbed slab;
- step 5) of laying reinforcing mesh pieces:
- wherein the reinforcing mesh pieces are laid on both sides of the floor slab and the rib according to structure requirements of the ferrocement ribbed slab, and then it is checked whether the structure requirements are met according to a blueprint;
- step 6) of performing in-situ casting:
- wherein self-levelling mortar, self-compacting mortar or self-compacting concrete is poured in-situ into the mesh truss enclosed by the bottom formwork and the reinforcing mesh, to integrally connect the reinforcing mesh, the bottom formwork and the mesh truss together, i.e., finish the in-situ construction of the in-situ cast ferrocement ribbed slab.