Method for constructing a tunnel course, and structural element for use by the method
AssigneeStabinor AS
InventorTorbjørn Dalegården
Life of this patent
Estimating the term…
Loading patent…
AssigneeStabinor AS
InventorTorbjørn Dalegården
Estimating the term…
A method and a structural element for the construction of a directionally flexible and watertight tunnel lining (1) or tunnel course (1), the method using pre-fabricated elements of concrete or sandwich structure (3, 4, 5; 73;73′). Interspace between such elements and extending transversely of the direction of the tunnel course or tunnel lining receives an interspace cast (14) using an outer flexible formwork (2) in the form of skirts (2′, 2″) attached to the outside of the elements (3, 4, 5; 73, 73′), and which through interconnection (11) thereof form a flexible, “bag-like” formwork (2) on the outside of the elements (3, 4, 5; 73, 73′). Together with conventional formwork (12) on the inside of the elements (3, 4, 5; 73, 73′) there is formed a defined cavity (13) which can be filled with injectable mass of concrete. After the concrete has hardened it will provide support to the installed elements (3, 4, 5; 73, 73′) as well as providing support relative to exposed surface portion of rock surface (10). The elements (3, 4, 5; 73, 73′) can be provided on the outside with a membrane (17). Further, the elements can be provided with injection paths (16) in order to at any time establish a completely watertight tunnel lining (1).
A method for constructing tunnel courses which are completely or partly surrounded by rock formations and/or are located in open air, the tunnel course in its longitudinal direction consisting of a plurality of mutually separate, pre-fabricated tunnel arch forming structural elements which are intended to be sealed against each other, comprising:
Dependencies are inferred from the claim text.