System and method for task assignment in workflows
AssigneeSap SE
InventorsTianyu Luwang, Wen-Syan Li
Life of this patent
Estimating the term…
Abstract
The method includes determining an assignment completion time distribution based on a task set defining a project, determining a project completion time distribution based on the assignment completion time distribution and the task set, determining a project cost based on assignments of the task set, and generating a list of project task assignments based on the project cost and the project completion time distribution.
Claims20
A method, comprising:
- determining an assignment completion time distribution based on a task set defining a project;
- determining a project completion time distribution based on the assignment completion time distribution and the task set;
- determining a project cost based on assignments of the task set;
- and
- generating a list of project task assignments based on the project cost and the project completion time distribution.
A non-transitory computer-readable storage medium having stored thereon computer executable program code which, when executed on a computer system, causes the computer system to perform steps comprising:
- determine an assignment completion time distribution based on a task set defining a project;
- determine a project completion time distribution based on the assignment completion time distribution and the task set;
- determine a project cost based on assignments of the task set;
- and
- generate a list of project task assignments based on the project cost and the project completion time distribution.
An apparatus including a processor and a non-transitory computer readable medium, the apparatus comprising:
- a task assignment module configured to determine an assignment completion time distribution based on a task set defining a project;
- a project completion module configured to determine a project completion time distribution based on the assignment completion time distribution and the task set;
- a project cost module configured to determine a project cost based on assignments of the task set;
- and
- an assignment combination module configured to generate a list of project task assignments based on the project cost and the project completion time distribution.
Dependencies are inferred from the claim text.